翻訳と辞書
Words near each other
・ Humber Armoured Car
・ Humber Bay
・ Humber Bay Arch Bridge
・ Humber Bay Park
・ Humber Bridge
・ Humber Bridge (Debts) Act 1996
・ Humber College
・ Humber College organizational structure
・ Humber Cycles
・ Humber derby
・ Humber East
・ Humber Ferry
・ Humber Forts
・ Humber Gap
・ Humber Gardens
Humber Gateway Wind Farm
・ Humber Hawk
・ Humber Heights – Westmount
・ Humber Hornet
・ Humber Islands
・ Humber Keel
・ Humber Light Reconnaissance Car
・ Humber Limited
・ Humber Loop
・ Humber Motorcycles
・ Humber Mouth
・ Humber NHS Foundation Trust
・ Humber Pig
・ Humber Premier League
・ Humber Pullman


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Humber Gateway Wind Farm : ウィキペディア英語版
Humber Gateway Wind Farm

Humber Gateway Wind Farm is an offshore wind farm 8 km east of Spurn Point off the coast of the East Riding of Yorkshire, in the North Sea, England; the wind farm is located in water depths around and covers an area of approximately . The wind farm became operational in June 2015.
It was developed by Humber Wind Limited, a wholly owned subsidiary of E.ON UK plc.; the wind farm consists of 73 3 MW wind turbines, with the electrical cable making landfall at Easington, and connecting to the National Grid, at Salt End, on the eastern outskirts of Kingston upon Hull.
==History==
In 2003 EON submitted a bid to the Crown Estate to develop a wind farm in the 'Greater Wash Strategic Area';〔Humber Gateway project timeline, (E ON)〕 a planning application was submitted in 2008 for a 300 MW, £700 million, wind farm. Additional planning applications for onshore substation, and onshore underground cable were submitted in 2009/2008, and approved in 2010.
The site was located over 8 km east of Easington, in an area roughly with a water depth of around , and approximately 15 km north-northeast from Donna Nook on the Lincolnshire coast. Cable connections were to make land fall at Easington and connect via about a 30 km underground cable connection with the National Grid near Salt End (near Hull). Initial plans were for a 300 MW wind farm, with 42-83 turbines.〔Humber Gateway - Non-Technical Summary, (E ON), pp.6-7〕 The wind farm had an expected operational life of 40 years based on the length of the Crown Estate lease, with possible turbine replacement after 20–25 years.〔Humber Gateway - Non-Technical Summary, (E ON), p.9〕
Governmental planning approval for a 230 MW (77 turbine) wind farm was given in early 2011. In December 2011 E ON published plans for a 73 turbine, 219 MW wind farm, using Vestas V112 3.0 MW turbines, with an initial completion date scheduled for spring 2015.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Humber Gateway Wind Farm」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.